Construction Act Amendment from 1 January 2027: What Does It Mean in Practice for Telecommunications Operators?

On 15 September 2026, the National Council of the Slovak Republic approved (Act No. 243/2026 Coll.) an amendment to Act No. 25/2025 Coll., the Construction Act, on the amendment and supplementation of certain acts (the Construction Act), which brings key changes for telecommunications operators from 1 January 2027.

The most significant practical impacts concern the permitting of new lines of electronic communications networks under Section 18(4) of the Construction Act, modifications of existing infrastructure under Section 18(5) of the Construction Act, and the notification procedure under Section 63 of the Construction Act.

Key Changes for Telecommunications Operators

  • New network line = Notification (Section 18(4) of the Construction Act): A new network route is subject to notification to the building authority (regardless of whether it is an overhead or an underground network).
  • Repair and replacement = no notification (Section 18(5) of the Construction Act): If the route does not change, neither notification nor a construction intent is required.
  • Risk of change in the notification regime (Section 63(5) of the Construction Act): If third parties issue binding opinions containing conditions or objections, the building authority will notify the obligation to proceed under the regime of construction intent proceedings.
  • Legalisation of buildings until 2040: The deadline for reviewing the suitability of buildings (built by 31 March 2025) is extended from 31 March 2029 to 31 December 2040.

New line vs. repair of an existing network

The Construction Act amendment provides that, before work begins, the type of intervention must be precisely defined:

  • New network line within the meaning of Section 18(4) of the Construction Act: Requires notification to the building authority. This is a simplified regime that replaces the construction intent proceedings (unless objections enter the process).
  • Repair, modification and replacement of a network line within the meaning of Section 18(5) of the Construction Act: If an existing line is changed, repaired or modernised without a change of route, the works require neither notification nor a construction intent decision.

Beware of route changes: if, during reconstruction, the line deviates from the original route, the intervention is automatically assessed as a new line and is subject to notification.

Exceptions under Act No. 452/2021 Coll. on Electronic Communications, as amended (hereinafter the “ECA”)

The Construction Act amendment does not abolish the special regime under Section 21(15) of the ECA. If a telecommunications operator proves that it holds an ownership or other right to the real property, neither notification nor a construction intent is required for:

  • underground connections of very high capacity networks up to 100 m in length,
  • new lines (both overhead and underground) up to 25 m in length,
  • small ground-level structures (distribution cabinets) with a built-up area of up to 1.5 m² and a height of up to 2 m.

Notification risk and third-party rights under Section 63(5) of the Construction Act

The amendment specifies in more detail the procedure of the building authority under the notification regime pursuant to Section 63(5) of the Construction Act where, on the basis of the submitted documentation, the building authority finds that:

  • the construction will (instead of the current wording: “could”) affect the rights of third parties, or
  • it is necessary to specify the conditions for carrying out the construction,

then it shall notify the builder stating the reasons (currently, the provision does not impose on the building authority an obligation to state reasons), that the notified construction may be carried out only on the basis of a construction intent decision and after verification of the construction project. A third party’s right is not considered to be affected where the interference with that right results from a special regulation.

Legalisation of unauthorized buildings until 2040

Section 84(7) of the Construction Act significantly extends the transitional period for the legalisation of unauthorised buildings constructed before the Construction Act entered into force (by 31 March 2025).

  • Original deadline: by 31 March 2029
  • New deadline: by 31 December 2040

The extension of the deadline does not in itself create an entitlement to authorisation of a building. For a specific building, it will still be necessary to meet the conditions of the relevant legal regime and of the proceedings on subsequent authorisation of the building.

For older buildings of electronic communications networks, the special regime under Section 131d of the ECA must also be distinguished. This regime applies to buildings constructed by 31 March 2025 and to the fulfilment of specific conditions, including continuous use, the absence of a final and binding removal order, and ownership or another right to the land.

The deadline of 31 December 2040 under the approved amendment must therefore be distinguished from the special regime under Section 131d of the ECA. In both regimes, the decisive factor is the fulfilment of specific statutory conditions.

Conclusion

The approved amendment brings practical changes for telecommunications operators, in particular as regards new lines of electronic communications networks, modifications of existing infrastructure and notification under Section 63 of the Construction Act. For each project, it will be decisive to assess the specific intervention, the legal title to the real property, the rights of third parties and the conditions for carrying out the construction, including the possible application of the special regime under Section 21(15) of the ECA.

Are you planning to build optical networks or base stations? Our law firm will be happy to assist you with the permitting process.